A major distribution pipeline was constructed from the Bukit 75 Reservoir to Pulai, forming part of a wider upgrading programme that doubled the Semangar Water Treatment Plant’s total capacity to meet growing demand across Kota Tinggi.
Project Details
Owner: Pengurusan Aset Air Berhad (PAAB)
Consultant: Ranhill Consulting Sdn Bhd
Main Contractor: Ikatan Gemajaya Sdn Bhd
Start Date: 1 March 2012
Completion Date: 8 July 2015
Contract Value: RM65.4 million
Project Description
Body: This package formed one of 7 packages under a wider upgrading, rehabilitation, and expansion programme for the Semangar Water Treatment Plant in Kota Tinggi, which doubled the plant’s original capacity from 159.1 million litres a day (MLD) to 318.2 MLD. The scope covered installation of a 22km distribution pipeline from the Bukit 75 Reservoir to Pulai, ensuring an adequate supply of clean water to the area.
Scope Of Work
- Supply and installation of a 1400mm diameter pipeline, approximately 22km, from the Bukit 75 Reservoir to Pulai
- Interconnection works between two existing pipeline systems
- Construction of steel truss structures for river crossings
- Underground pipeline connection works
- Installation of valve chambers and associated fittings
Status Note
Body: This project was completed as agreed and successfully commissioned. The defects liability period has ended without any major defect issues.





