A major distribution pipeline connecting Bukit Batu to Pengkalan Jaya was constructed to improve the efficiency and continuity of water supply across the region, incorporating river crossings and trenchless installation methods.
Project Details
Owner: Pengurusan Aset Air Berhad (PAAB)
Consultant: BW Perunding Sdn Bhd
Main Contractor: Ikatan Gemajaya Sdn Bhd
Start Date: 18 March 2024
Completion Date: 14 November 2025
Contract Value: RM15.9 million
Project Description
Body: This package involved installation of a main distribution pipeline measuring 800mm in diameter, spanning approximately 7.66km from Bukit Batu to Pengkalan Jaya, including river crossing structures and pipe-jacking works at multiple locations to ensure efficient and uninterrupted water distribution.
Scope Of Work
- Supply and installation of 800mm diameter MSCL pipeline, approximately 7.66km, from Bukit Batu to Pengkalan Jaya
- Construction of two steel truss crossing structures over Sungai Air Molek and Sungai Melaka (Sungai Duyong)
- Permanent interconnection works between the new 800mm MSCL pipeline and the existing 500mm MSCL pipeline at two locations
- Execution of six pipe-jacking works to install pipelines across obstacles and utilities without open-cut excavation
Status Note
Body: This project was completed within the agreed timeframe and successfully commissioned. As of the time of writing, the defects liability period remains ongoing.